Wednesday, December 2, 2015

Bathroom progress

The weather this November and the start of December has allowed us to continue on with our bathroom project.  Working this late in the season with these types of projects is an added bonus!
Septic tank at the front 9 location (between holes 4 and 7).

Septic tank and drain field at the back 9 location (between 13 and 15)

Drain field finished at the front 9 location.  

Plumbing in and concrete prep work complete at the back 9 location.  

Concrete being poured at the back 9 location.  

Trenching for the water lines to the bathroom on the back 9

Water line pipe installation 

Trenching and installing water lines to the front 9 location

Block work complete at the back 9 location.  

Our friends at Catapillar brought in a D3 dozer for us to use at the front 9 location.  Some site work was needed to remove a few knobs and to fill in a valley between the location and the septic tank. 

No comments:

Post a Comment

Blog Archive