Wednesday, February 27, 2013


The Heritage shop has been very loud with the sound of grinders at work as we tear down and grind each reel in preparation for the 2013 golfing season.  Seals, bearings and other parts are replaces if needed and the reels are reconditioned as if they were new from the factory.  We use 100 reels to maintain the 36 holes here at MGC with the primary reels being serviced during the off-season.  This process takes loads of time and must be completed properly to achieve top quality turfgrass conditions.  

 Reel set-up on the Grinder
 Accuracy with-in one-thousandth of an inch 
 Reel spin grinding
 Relief grinding a reel
 Grinding of the Bedknives
 Reassembly of the Reel 
Putting the Reels back on the Tractor Unit
Equipment tires should never be left flat for extended periods of time or damage will occur to the sidewalls.  We air up any flat or low tires every two weeks in both shops and take note of those tires so they can be monitored more closely in the spring.

Wednesday, January 16, 2013

                                         Small Ice Pockets on Heritage #17 Green
                                         Over all picture of Heritage #17 Green
                                         Very Thick Ice (2-4") on Greywalls #2 Green
                                         Greywalls #4 Green - ouch
                                         Greywalls #5 Green

This winter (or lack there of) has put our turf in a very vulnerable position.  The open areas are now susceptible to winter desiccation while the low pockets on the greens have ice accumulations from last weeks meltdown.
We need more snow cover very soon to insulate the exposed areas and then we will need an early spring melt to help reduce the severity of ice damage.

Friday, December 21, 2012

                                          Milorganite in the ice on the edges creating air pockets
                                          Ice on #15 Green Greywalls
                                          View of the Ice on #15 Green in the low areas

I was able to get out and check the golf course on Wednesday before the snow storm arrived.  The melt down last weekend did create some solid black ice pockets in the low areas on some of the Greywalls greens.  The Heritage greens looked good as the ice on those greens was very porous and was more of a hard crunchy snow type.  I always worry more about solid black ice cover on the Heritage course because the amount of poa annua growing within that canopy.  In previous years I have seen the bentgrass on the Greywalls greens survive almost 4 months of solid black ice cover.
It is always good to know the ice covered areas so I can determine the type of winter damage or winter kill when the snow melts away in the spring.
I did not see any fungal damage on the surfaces that were treated in October/November.  Once again our spraying worked very well eliminating that early round of snow mold growth.  The big kicker will be that fungal growth spike during the last month of winter during snow melt.  I am worried that the lack of early snow and open canopy caused some photo-degradation of our product reducing its length of protection.
Time will tell but for now lets enjoy the WINTER!!!!!!
                                         Ski tracks left on #14
                                         Ski tracks on #8 Green
                                         Ski pole damage on #5 Green
                                         Ice left on the Green from ski tracks
                                         Ski tracks on #5 Green
                                         Ski tracks around #5 Green
                                         Ski tracks right across #4 Green

Well we finally got enough snow to start enjoying some outdoor winter activities!
For an unknown reason someone decided we had enough last week to cross country ski on the Greywalls course.  This disrespectful individual also skied across the roped off greens damaging the turf below because there was not even close to enough snow for that kind of activity on a golf course.
The Greens are roped off for a reason please keep your winter traffic as far away from these areas as you can plus please be patient and wait for enough snow cover before enjoying the MGC property.

Wednesday, December 19, 2012


I repainted the parking lines in both shops this week.
This is a critical step completed every winter to assure our equipment is parked properly during the season every day.
Proper parking creates structure in the building and allows access around every mower to perform daily maintenance checks.  Equipment parked properly is safer (no climbing over) and saves time because there is no longer a need to move everything in order to perform routine daily checks on a unit that is parked in the middle or back.

Friday, December 14, 2012

I took my assistant Andy and our Greywalls mechanic Bob down to a Grinding seminar in Milwaukee yesterday.  The focus was on reel science and optimum cut technology.  It was a great class and we were able to gain valuable knowledge from the 'pros'.  The technology and saftey in this area has increased dramatically over the last 10 years.  It was a long day that started at 2:30 am but it was worth every mile of the drive.
The staining/sealing/painting and refurbishing of our signage and other course supplies is underway.  Andy finished most of it the last few weeks.  I hope to get the rest of it completed before the holidays so I can move my focus to the mechanical work and reel grinding at the start of 2013.

Blog Archive