Friday, June 21, 2013

We took the time to add a water line to the shop at the Greywalls course last week during an outing afternoon.  We will use this to supply water to a dedicated mix/load pad and a wash off area after backlapping reels in the shop.  
 Hand digging over the well fill line
 Trenching with the old ditch-witch (she's still alive)
 Mike B. laying some serious pipe
 The crew back-filling the trench
 Two thumbs-up from Mike B. and Matt
Great post work

No comments:

Post a Comment

Blog Archive