Aerification of the back nine Greywalls Greens went smooth on Tues. We hope to have the Heritage irrigation system up and operational by friday so we can aerify those greens next week.
Our process involves aerification with 1/4 inch mini tines on quad tine blocks followed by a deep vertical mowing using 2mm carbide tip blades to remove massive amounts of organic matter. That is followed by a mowing and topdressing resulting in a surface that looks almost untouched and still putts very well.
No comments:
Post a Comment