Wednesday, April 30, 2014
The new deck path next to the putting green is going very well. The sod was removed and eight loads of soil were excavated out of the hill by hand. We harvested four truck bed loads of rocks from Greywalls to build the rock wall and rock bed that we can eventually plant some perennial within. The pavers were laid in a sand bed and are going to be held in place with a concrete strip along the edge. Sod will then be laid back along the edge and all of the seems and cracks will be filled with a soil seed mix. The idea is to have these with in the turf, we can then simply mow over them.
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2014
(91)
-
▼
April
(17)
- The Heritage course came through the winter bette...
- Nice weather for April 29th. We are so ready fo...
- With the death of the old red barn we are now in...
- The cart barn parking lines have all been repain...
- No title
- We expanded the Recycling at each cart barn thi...
- The new deck path next to the putting green is g...
- The new drain on #14 Heritage approach is worki...
- Our Equipment on the Heritage side has all been fi...
- I fired up the old girl to help us move some sn...
- The ground above the stump burial pile left of #...
- Putting Green #1 Greywalls is seeing the light (...
- With this weather the sign shop is in full force...
- We took our first fertilizer delivery of t...
- More flood water pumping last Sunday at the Heri...
- The green on #16 Heritage is partially exp...
- Plowing last week and more to come tonight! The ...
-
▼
April
(17)
No comments:
Post a Comment