Thursday, October 25, 2012











Number 5 Red Tee on the Greywalls course has now been leveled.  An over-site in the construction process left this tee with 20 inches of fall from the front to the back.  The tee felt more like a launching pad than a tee off zone.  
We completed a total face lift.  The sod was removed, 4 inches were shaved off the front and 8 loads of fill were added to that material to lift the rear of the tee.  
Some heavy spring topdressing and rolling followed by aerification after the sod roots down into the soil and this tee will be back in business by early to mid summer 2013.