Tuesday, May 21, 2013

The boys tackled the hill on #18 Greywalls.  No small task to climb and cut!
We added a drain on Greywalls next to #14 green in the approach valley to the right.  This is was an area of excessive moisture retention that needed to be addressed.   
' The Doc' in Blue leading new staffers Chris and Matt
 This water will now travel down the pipe and leave the area
 The guys love laying pipe.  Nothing better than an early season projects to build crew morale and confidence as everyone gets to know each other and works as a team.  
 'The Doc' completing some turf mending
New guys Mike B. and Kevin were a fine support staff for 'The Doc' (front and center)
Great work fellas!!
Heritage Irrigation is now up and going.  
One week, 8 broken heads, one bad hydraulic tube, one broken pipe, one leaky foot valve and one malfunctioning booster pumps later it is hold strong.   
 Andy and Clay in action next to #2 Green
 Andy found the issue
A Leaky hydraulic control tubing

Monday, May 13, 2013

Today we will be starting up the Heritage irrigation system - always an adventurous time.  

 A view back to #11 Heritage from #12 Green
Lake view vista would be fantastic with out those conifers.  
On Friday I over-seeded the winter damaged areas on Greywalls with T-1 bentgrass.  The previous day we double spiked all of the greens and opened up little holes for the bentgrass to fall into for germination.      

 Spreader and seed

We are also completing an irrigation audit/head trimming and a solid tine aerification to the fairways.  These two things are impossible to complete with any efficiency after we open so we are busting our humps to get it done now.
Solid Tine aero-vator in action on #10 Greywalls.  

Wednesday, May 8, 2013

I started up the Greywalls irrigation system on Monday because we had to get water on our sand based greens to begin recovery.  
As you can see the #15 bridge continues to move/settle.  Over the winter it moved so much that it pulled the gasket joint coupling off.  Two floor jacks, four screw drivers, needle nose pliers, an adjustable wrench, a couple blocks of wood, a hammer and some not so nice words later the problem was corrected.  

 Leaking!
Repaired

We have the irrigation system up and going on Greywalls to start the recovery process on these damaged areas.  As you can see the turf is already starting to recover.  It is just going to take time.  
There is still lots of green plant crowns so all hope is not lost.  

 #12 Green Greywalls last week after snow melt
#12 Green Greywalls May 8th
#12 Green Greywalls May 17th Healing indeed
#12 Green Greywalls May 29th

Blog Archive