Sunday, March 26, 2017

Spring conditions

Spring conditions:
Three winter melts has left us with minimal snow pack and it will not take long (after the temperatures rise) for the course to be completely exposed.  I expect us to have an early opener this year.  
From what I can see Turf conditions are outstanding!  Every fall fungicide application has seemed to work very well.   
Several different products and combinations were used on the fairways and we are excited to see the complete results soon. 

 
The spray lines are very evident right after spring melt.  
Treated on left ---- untreated on right

 
14 green Heritage has never been drier in the spring.  The combination of the drains that we installed several years ago on the approach and an aggressive 3/4" core aeriation (back filling the holes with sand) has made a huge improvements.  

A look down 9 fairway Heritage shows excellent turf quality on the treated fairway and poor quality on the untreated rough.  I can not stress enough the importance of these fall spray applications.  The turf has a huge advantage in the spring when it comes out of winter disease free.  Overall Course quality increases dramatically as the turf is fuller thicker and has less weed encroachment.  

7 green on the Heritage is usually one of our last areas to melt off in the spring.  It will not take as long this year with the limited snow pack.  

 
Another Classic picture on number 2 Greywalls.  The ring around the green shows Fungal control that was near 100% 
Individual rings of snowmold are hard to even find in the spring on untreated turf because all of the plants seem to be infected with the disease.  


Putting Surfaces:
 
Putting green quality is also excellent from what we can see so far.  We will know more after all of the surfaces are exposed.  
Pictured above is a great example of poa annua suppression on the Greywalls greens.  We use a plant growth regulator call trimmit on the Greywalls greens: with the active ingredient paclobutrazol.  This PGR suppresses the poa plant more than the our desired bentgrass plants thus giving a competitive advantage to the bentgrass.  

 
Solid tine holes still visible from the fall.  Before our last mowing of the season we solid tine the greens to leave open channel that aid in water movement.  We do not want standing water on our putting surfaces that could freeze and create issues.  

 
The turf on 15 green Heritage is definitely survived the winter better than this deer.   

 
Close up view of the turf on 11 green Heritage.  Nothing but pure health coming out of winter.  
I am very proud of our turf management programs here at MGC; we continue to evolve and get better.  

New Signage

New signage:
 
Several holes had yardage adjustments on the Greywalls course plus a new tee was constructed on #11; new hole signs were needed.  We used 4x4 cedar posts and our routing kit to make the new signs.  
The post style signs are simple and will fit in beautifully on the Greywalls course.  

 
New directional sign were also created for the Heritage course.  These new signs now match the Greywalls signs and will replace the old green signs.  Our goal is to gain more consistency between the two courses.  

High Winds

High Winds!
We had a major wind event this winter that took down 18 trees in managed turf areas.  The wind was sustained at 40 mph with gusts up to 60 mph for 6 straight hours.  These winds definitely added work to our spring cleanup duties.   
The wind was just to powerful for many of the exposed Hemlocks on the back 9 of Greywalls to handle.  The majority of the trees came down back here.  

 
This group of trees between 12/13 on Greywalls gets smaller and smaller every year.  

 
This majestic spruce at the enterence of the club was no match for the winds.  It's roots gave out and it smashed down on the club sign.  

 
Many trees along Grove Street came crashing down in the wind.  

 
The way these all snapped off proves the shear strength of the wind.  

 
Even Maple trees came down in the wind.  

 
I could hear these trees snap off as I worked in the shop with the doors open.  

 
Some of these trees not only snapped off but the tops flew a good distance away from their trunks.  

 
Another tree top laying 15 yards away from its base.  

Clean-up will take some extra time this spring; I will have to pick up an additional chain saw and bring staff back a bit early to complete the clean-up process.  

Winter Education

Winter months are a time we attend education  conferences.  It is very important for us to stay informed on all of the new advancements learned from University research and private product development.  


 

 Bob Vavrek from the USGA talking to at the Northern Great Lakes symposium in Northern Wisconsin. 


 

Two leading pathologists Dr. Vargas from Michigan State and Dr. Kerns from NC State talking at the Reinders Conference in Milwaukee 


 

It is always exciting to see New Equipment at the GCSAA trade room floor.   This is a massive show and was held in Orlando Florida this winter.  


 

Dr. Rossi from Cornell University talking golf live on GCSAA TV at the trade show


 

GCSAA constructs a live turf green complete with bunkers in the middle of the trade room; a very impressive display.  Mowers and rollers can be tested on the turf surfaces plus all of the different kinds of bunker liner options are shown in the bunkers around the green. It really gives the consumer hand on experience with the different product options. 


I always appreciate winter education conferences.  The people in our industry that put them on and the speakers that travel to share their knowledge are dedicated to golf. 

Monday, February 13, 2017

February Update

After some technical issues our blog is now back up and functional.  

The 2016 season came to a close with all important tasks being completed.  Our timing flowed around weather events as we stayed glued to reports and predictions.  

Pictures and Explanations tell the stories below.....

UW once again utilized our 11th fairway on the Heritage course as their Northern most winter fungal test site.  The data learned from these trials/tests/evaluations is critical for golf courses around the world that manage turf in seasonal locations.  We are very proud of our relationship with UW and are a happy host location.  

Our own snowmold fungicide applications to our primary playing surfaces (Greens/Approaches/Tees/Fairways) were completed properly but we faced many challenges.  
The lack of heavy late season frost caused the trees to hold their leaves late.  Most leaves began to fall right when it was time for us to start making our applications.  Leaf Blowers had to stay right ahead of the spray rig to provide a clean surface for the spray application.  
Wind and rains also created many unsprayable days.  Being patient is a key aspect of winter preparation.  When weather condition do not allow you to complete one task, you simple refer to your list of essential processes and complete another job.  
We applied several different combinations of products to our Fairways this year.  I am looking forward to seeing the results in the spring.  


 
Pictured above is Heavy sand topdressing to the 14th green and approach on our Greywalls course.  This sand is essential for winter crown protection on our low cut turf.  We also burry the tees with sand.  
These sand applications are made after the turf surfaces have been sprayed with preventative fungicides.  

 
Heavy sand topdressing on the 13th green of the Heritage course.  

 
Close up view of number 9 green Greywalls two months after the sand was spread.  A winter melt down created open turf conditions on the high peaks.  Note the sand insulating the low cut turf from low/harsh winter temperatures.  You can also see the black milorganite fertilizer; which is applied on top of the sand.  The black color of this product melts off snow and ice quickly in the spring during high sun days.  Solar radiant heat is amazing and we use it to our advantage.   


 
Pictured here is the large compressor used to blow out the Greywalls irrigation pipes.  Irrigation winterization is an essential part of our late fall tasks.  If not completed properly pipes and heads will rupture and break as the frost dives low into the soil profile.  The damage would cost the club 10's of thousands of dollars plus waste spring hours as we would have to make repairs.  Our spring hours should be dedicated to grooming turf for the season. 
 
 
As the compressor fills the lines with air we turn on the heads and open valves; starting at the air source and working out.  It takes us 2 days and around 120 gallons of diesel fuel to blow-out Greywalls with a 750cfm compressor.  It takes 3 days and around 115 gallons of diesel to blow-out the Heritage with a 375cfm compressor.  
As soon as water turns to mist we move on to the next head down the line.  The importance of this task can not be overlooked.  It is impossible to aggressively manage turf for today's playing requirement during the hot summer months without a supplemental water supply. 


 
Taking advantage of late fall days to complete some tree and Forest Management is essential.  There is never enough time during the active golf season to focus on this aspect of property management.  
The forested area next to 13 tee on Greywalls was cleaned up.  Several trees fell in this area during late season high wind events. 

 
The young Hemlock grove behind 2 green Greywalls was thinned out.  This green struggles more than any hole on the property from surrounding tree growth.  The next phase to remedy the turf decline on this green is to remove several large hemlocks front right of the green.  These trees have grown to a height that blocks the very important morning sun. 


 
Work continues on the front 9 bathroom location on Greywalls between the black tee on 4 and 7 fairway.  Concrete was poured this fall and the block work was completed.  

 
Members and staff working together to complete the bathrooms.  

 
The block work was completed two days before it started to snow.  

 
We took advantage of a January warm up.  A tractor with a snowblower was used to clear the main path out to the new front 9 bathroom location. 10 days of above freezing daytime temperatures allowed our builder to get the frame work completed.  We will have the finish work, plumbing hook ups and exterior landscape to complete in the spring.  


 
The floor of the halfway shack was removed because it was damaged from a leaking refrigerator.  The plan is to do some reorganizing of this space in the spring.  


 
The new red tee pad on 11 Greywalls was constructed.  Pictured here is the crew removing the native sod left of the original tee.  The original red tee was constructed on a stump pile causing it to cave in after years of stump decomposition.  

 
New 11 red tee pad after Sod was removed and sand was hauled in to level the site.  

New tee pad for 11 red.  The new location is on secure ground and has a better look down the fairway than the original tee.  
 
 
The original 11 red tee.  Note the holes opening up around the tee surface.  The tee is a lumpy mess and very unsafe.  The Sod will be removed and placed on the new pad in the spring.  

 
Irrigation lines were re-routed over to the new pad.  A mini excavator was used to trench the line in.  Snow put a hold on this project completion until spring.  


The rails on the 15 Greywalls bridge needed to be replaced after a beverage cart smashed one side off this season.  We learned the wood was getting soft so a total rail replacement was necessary.  

 
 
All course accessories get attention during the winter months.  Tee markers, bells and 150 poles always get a fresh coat of paint, wood products get restrained or resealed, signs get touched up and new signs are created as needed.  


 
Lots of hours are spent in the old plow truck.  Clearing snow from all of our driveways and lots for complete access takes 4-5 hours every time it snows.  

 
Break downs don't end in the winter months.  Here a Hydraulic line blew on the plow truck. This is a quick and easy fix, as long as the plow dealer is open and I can get the correct part.  

 
Snowshoeing is my mode of transportation in the winter months.  Checking the turf is essential to be able to predict trouble areas we might face after the snow melts.  Knowing is half the battle so we can properly prepare ourselves for recovery efforts if needed.  
Snowshoeing also allows me to monitor winter traffic.  I must make sure no one is entering our roped off greens or making paths over our tee surfaces.  
 
 
An exposed 9th green on Greywalls still looks fantastic with heavy sand topdressing in place to protect the plant crowns.  

Exposed high Fairway peaks has turf with tip burn from cold winds.  This turf will recover rapidly after a spring mowing followed by warm weather.  
 

 
Hundreds of hours are spent grinding reels and replacing all worn out bearings and seals.  This is currently the most critical component of proper turf health for the 2017 season.  A razor sharp mower is essential for management of all grass at all heights of cut; but is especially critical for managing high verdure turfgrass systems at very low heights of cut with high traffic.  


Our new Toro 5410 fairway mower was delivered this winter.  This mower has proven to be the right fairway mower for our property.  Not only does the 5410 climb our difficult terrrain better than any other machine it has had a lower cost of ownership.  Our 10 year old 5410 is still performing like day 1 and we have not had any expenditures outside of regularly scheduled maintenance.   
 
 
We also purchased a second pull behind pro force turbine blower.  The man hours saved along with quality and speed of operation is astonishing.  Having two of these will allows us to use one on each course during fall leaf cleanup or double them up while vertical mowing large areas of turf.  These turbine blowers are a must have for modern turf management.  

Blog Archive